Project Development at Theaterplatz in Aachen
The project development at Aachen’s Theaterplatz aims to revitalize the square and restore it as a gathering place in the city center.
Part of the project also involves the redesign of the corner building at Theaterplatz 1. Built around 1910, the building suffered extensive damage during World War II, with nearly all of its upper floors destroyed. Twelve years after the war, it was rebuilt using conventional construction methods with masonry walls and concrete slabs. A particular eye-catcher is the facade facing the theater, made of “Piedra Dorata” sandstone from Tuscany.
The building itself is not a listed historic structure, but due to its location, it is nonetheless subject to the historic preservation zoning ordinance. For this reason, it is particularly important to us to preserve its original character and ensure a sustainable, socially responsible use of the space.
Spanning six floors, the building will feature 1,800 m² of living space in units of various sizes, designed according to the POHA House co-living concept and complemented by a co-working area on the first floor. The centerpiece will be the shared space in the attic—complete with panoramic views of the cathedral and city hall! On the ground floor, the current tenants, Liek & Müller and the Hirsch Pharmacy, will remain at their current locations.